Milan Rail Over Bridge (ROB)

Milan Rail Over Bridge is constructed to connect East and West roads and as solution to flooding during the monsoon. This 700-meter bridge has underpass and highway ramp.

The project consists of two parts:

Part 1 consists of stretching the subway of Milan, bridge for vehicles for WEH and the rail over bride from the initial point in Santacruz to WEH.

Part 2 consists of the coming forward of the 60-meter steel infrastructure when traffic blocks are made accessible by Railways Authorities and the construction of a larger steel structure in complement with the first one.

Hon’ble Chief Minister opened the bridge in May 25, 2013.